Private easement and its main features


Access to the site through the Economy ditch

An economical option for organizing a check-in, which is designed for cars to enter the site.

Standard

Price: 36,000 rub. Full construction

. The price includes all necessary materials and their delivery:

  • geotextiles,
  • plastic geogrid (to strengthen slopes),
  • quarry sand - up to 4 m3,
  • crushed stone m600 - 2 m3,
  • asbestos pipe.

Stages of work:

  1. We manually clean the ditch and remove the soil;
  2. We lay road geotextiles with a density of 250 g/m2;
  3. We arrange an underlying layer of sand;
  4. We install an asbestos pipe in a ditch up to 60 cm deep;
  5. We fill the pipes with quarry sand and compact them;
  6. We arrange a covering of crushed stone of fraction 20-40, M600, compact it;
  7. We strengthen the slopes with geogrid.

Characteristics of asbestos pipe:

  • Type: asbestos,
  • Diameter: 300 mm,
  • Length: 5 m.

Advantages of asbestos pipe:

  • not subject to corrosion;
  • ease of installation, without special equipment;
  • resistance to aggressive substances and liquids;
  • relatively low cost.

Disadvantages:​

  • low strength and fragility.

How to attach and unattach via State Services: instructions

To change the voting location, the user must go through the identification verification procedure on the State Services portal. Only with a verified account can you use all the features of the site.

In order not to make a mistake in registering an absentee ballot, before changing the polling station through State Services, the voter should study the algorithm of necessary actions:

  1. First you need to register on the site or log in if you already have an account.
  2. Log in to your personal account.
  3. Select from the catalogue. In it, select the sub-item “Selection of a polling station for the elections of the President of the Russian Federation.” A section will open with information about when the elections will take place and how many days are left to submit an application.
  4. Check the box for the “Online” application method.
  5. Fill out the application form. All personal data in it will already be filled in in accordance with the data from your personal account.
  6. Check the entered data.
  7. Selecting a polling station for voting through State Services.
  8. Check that the address matches the voter's location on voting day.
  9. Confirm that the registration location is still valid. It must exactly match the mark on the passport.
  10. Wait for an SMS with a confirmation code.
  11. Enter the received code in the window that opens.

If all the steps on how to change a voting precinct through State Services are completed correctly, the system will automatically add the person to the voter list at the precinct chosen by him. Thus, a site user, after going through just a few steps, will be able to receive an electronic absentee ballot. This gives him the right to vote not at his official place of residence, but at his place of presence on election day. Another plus is that you don’t have to print out this coupon; you just need to download it to your tablet or smartphone and present it electronically.

In order for the change of State Services polling station to proceed quickly and without errors, before submitting an application, you must comply with several mandatory conditions:

  • the applicant must be an adult;
  • the application is submitted only once.

A user who has successfully registered can not only choose a voting point convenient for him, but also receive many other services on the gosuslugi.ru portal.

Access to the site through the Economy+ ditch

Designed to allow cars and trucks weighing up to 25 tons to enter the site.

Price: 39,000 rub. Full construction

. The price includes all necessary materials and their delivery:

  • geotextiles,
  • plastic geogrid (to strengthen slopes),
  • quarry sand - up to 4 m3,
  • crushed stone m600 - 2 m3,
  • two-layer corrugated plastic pipe – 1 pc.

Stages of work:

  • We manually clean the ditch and remove the soil;
  • We lay road geotextiles with a density of 250 g/m2;
  • We arrange an underlying layer of sand;
  • We install a plastic pipe in a ditch up to 60 cm deep and up to 80 cm wide;
  • We fill the pipes with quarry sand and compact them;
  • We arrange a covering of crushed stone of fraction 20-40, M600 and compact it;
  • We strengthen the slopes with plastic geogrid.
  • Work warranty - 6 months.

Characteristics of SN8 plastic pipe:

  • Pipe type: double-layer corrugated plastic;
  • Load class: SN8;
  • Length: 6 meters;
  • Diameter: 300 mm.

Advantages of SN8 plastic pipe:

  • abrasion resistance, o
  • resistance to chemical influences and corrosion,
  • low cost,
  • long service life.

Disadvantages of SN8 plastic pipe:

  • cannot withstand high loads.

How to register an easement on a land plot

  • Private - involves an agreement concluded to achieve the goals of one owner of a plot on the territory of another plot. Such reasons include: laying communications, transport passage, installation of specialized facilities and others. The encumbrance of an easement on a land plot must be sealed by an agreement. Registration of the transaction can be voluntary or through the court, however, in the latter case, the person applying for the easement is obliged to prove that there are no other options and it is impossible to do without invading someone else’s land.
  • Public - involves a transaction in which the obligated party is the state or local authorities, and the population acts as the authorized party. What is the difference between a private easement and a public one? The fact that public ones are set for an unlimited number of persons.

Sometimes even a privatized plot does not give the owner the right to dispose of it at his own discretion. In some cases, your neighbors may want part of your property. The transfer of part of the rights to a land plot to a third party is called an easement. Neighbors who, for example, need to install water, can enter into an easement agreement, and at the same time, part of the communications will run through your site. What easements exist and the period for which they are concluded, we will consider further.

Access to the site through the “Steel” ditch

Designed for a driveway width of 5 m.

Price: 57,000 rub. Full construction

. The price includes all necessary materials and their delivery:

  • geotextiles,
  • plastic geogrid (to strengthen slopes),
  • quarry sand - up to 4 m3,
  • crushed stone M600 - 2 m3,
  • steel pipe - 1 pc.

Stages of work:

  1. We manually clean the ditch and remove the soil;
  2. We lay road geotextiles with a density of 250 g/m2;
  3. We arrange an underlying layer of sand;
  4. We apply an anti-corrosion coating;
  5. We install a steel pipe in a ditch up to 80 cm deep and up to 100 cm wide;
  6. We fill the pipes with quarry sand and compact them;
  7. We arrange a covering of crushed stone of fraction 20-40, M600, compact it;
  8. We strengthen the slopes with geogrid.

Characteristics of steel pipe:

  • Pipe type: steel,
  • Length: 6 m,
  • Diameter: 273 mm.

Advantages of steel pipe:

  • high strength;
  • relatively low cost.

Disadvantages of steel pipe:

  • prone to corrosion.

Entering the site through the “Reinforced Concrete” ditch

Designed for a driveway width of 6 m.

Price: 62,000 rub. Full construction

. The price includes all necessary materials and their delivery:

  • geotextiles,
  • plastic geogrid (to strengthen slopes),
  • quarry sand - up to 4 m3,
  • crushed stone M600 - 2 m3,
  • reinforced concrete pipe - 3 pcs.

Stages of work:

  1. We manually clean the ditch and remove the soil;
  2. We lay road geotextiles with a density of 250 g/m2;
  3. We arrange an underlying layer of sand;
  4. We install reinforced concrete pipes in a ditch up to 80 cm deep and up to 100 cm wide;
  5. We fill the pipes with quarry sand and compact them;
  6. We arrange a covering of crushed stone of fraction 20-40, M600, compact it;
  7. We strengthen the slopes with geogrid.

Characteristics of reinforced concrete pipe:

  • Pipe type: reinforced concrete,
  • Diameter: 400 mm,
  • Length: 2.5 m.

Advantages of reinforced concrete pipe:

  • stability during operation in a wide temperature range;
  • high frost resistance;
  • is characterized by high strength and durability;
  • not subject to corrosion and rotting processes;
  • relatively low cost.

Disadvantages of reinforced concrete pipes:

  • not resistant to aggressive liquids;
  • has heavy weight.

Easement on a land plot - what is it? Land easement agreement

An easement for a part of a land plot is issued if there is no need to use the entire plot to satisfy the needs of a neighbor or the public. Such a partial easement is possible in both private and public versions. In this case, the contract is drawn up according to the same rules and in the same order.

Interesting: What to do if the car is towed to St. Petersburg

Let's give a simple example. The allotment is operated under conditions that are not stipulated in the contract, and not for its intended purpose. In this situation, only at the initiative of the judicial authorities can the established restrictions become invalid if the owner of the land provides undeniable evidence regarding the incompetence of using the land for other than the specified intended purpose. Or another case where a land easement agreement was concluded with the aim of creating a new water supply interchange, but in connection with the construction of a well, such a need disappeared by itself.

Access to the site through the “Improved” ditch

Designed to allow cars and trucks weighing up to 25 tons to enter the site.

Price: 76,000 rub. Full construction

. The price includes all necessary materials and their delivery:

  • geotextiles,
  • formwork boards,
  • quarry sand - 2 m3,
  • crushed stone M600 - 2 m3,
  • double-layer corrugated plastic pipe,
  • reinforcement AIII 10mm,
  • concrete M300 4m3.

Stages of work:

  1. We manually clean the ditch and remove the soil;
  2. We lay road geotextiles with a density of 250 g/m2;
  3. We arrange an underlying layer of sand;
  4. We install a plastic pipe in a ditch up to 60 cm deep and up to 80 cm wide;
  5. We fill the pipes with quarry sand and compact them;
  6. We arrange a covering of crushed stone of fraction 20-40, M600, compact it;
  7. We install formwork,
  8. We build a frame from 10mm reinforcement,
  9. Fill it with concrete.

Characteristics of SN8 plastic pipe:

  • Pipe type: double-layer corrugated plastic;
  • Load class: SN8;
  • Length: 6 meters;
  • Diameter: 300 mm.

Advantages of SN8 plastic pipe:

  • relatively light weight,
  • abrasion resistance, o chemical and corrosion resistance, o low cost,
  • long service life.

Registration of an easement for access to the site

  • the circumstances according to which the parties followed during the conclusion of the easement agreement have changed significantly;
  • restrictions on the rights of the owner of land encumbered by an easement have increased or decreased at the end of a specific period after its establishment;
  • the parties came to a general agreement to change the amount of the proportionate fee for the easement (private easement);
  • the scope of the easement has increased or decreased;
  • a state authority or local government body adopted a regulatory legal act that changed the act by which the easement was established in relation to the amount of value (public easement);
  • the court made a decision to change the value of a private or public easement by adjusting the easement agreement or a regulatory legal act of the administration.

Interesting: Tax amount for individual entrepreneurs in 2020

However, if the territory for passage is required not only by one citizen, but by a whole group of people, the authorities can establish a public easement for passage and passage in order to ensure the interests of local residents. Such a decision will be made at public hearings and will not be agreed upon with the owner of the encumbered plot.

Rating
( 2 ratings, average 4 out of 5 )
Did you like the article? Share with friends: