- Sample. Pledge agreement for an apartment owned by the borrower to ensure repayment of the loan amount under a loan agreement with collateral. Pledge and mortgage agreement → Sample. An agreement to pledge an apartment owned by the borrower to ensure repayment of the loan amount under a loan agreement with collateral... - pay all costs for registering this agreement. 2.3. the mortgagee has the right to: - check the documents and actual availability, condition and conditions of maintenance of the mortgaged apartment; - require the borrower-mortgagor to take measures necessary...
Acceptance certificate for completed work
The more detailed the act is drawn up, the fewer disputes will arise in the future. The best option would be to draw up a detailed report by the owner himself in advance, followed by checking point by point and making amendments by the employer. Who signs? The contract is signed by the person transferring the apartment for use - the landlord.
And the person receiving it is the employer. If for some reason one of the participants cannot be present when drawing up the act, his interests can be represented by another person for whom a notarized power of attorney will be issued. However, it is better when the signatures in the agreement and the signatures under the deed are the same. How many copies of the document are needed? As we have already said, this is an annex to the agreement.
Therefore, it is quite logical that there should be 2 copies of the act, one for each copy of the lease agreement.
Certificate of acceptance of premises after renovation
An agreement to pledge an apartment owned by the mortgagors to ensure the return of the loan amount under the loan agreement ... - pay all costs for registering this agreement. 2.3. the mortgagee has the right to: - check the documents and actual availability, condition and conditions of maintenance of the mortgaged apartment; - require the mortgagor to take measures necessary for...
- Act on the return of inventory items deposited (Unified Form N MX-3) Documents of the enterprise's office work → Act on the return of inventory items deposited for storage (Unified Form N MX-3) document “Act on the return of inventory items valuables deposited (unified form n mx-3)" in excel format you can...
The tenant (tenant) is not responsible for deterioration of the property in the following cases: - natural wear and tear; - the fault of the owners of neighboring premises; - the fault of utility services. Appendix "No. to the Lease Agreement" 20
The Landlord: on the one hand, and the Tenant: on the other hand, have drawn up this act of acceptance and transfer of the apartment for rent: 1. The Landlord transferred, and the Tenant accepted for rent, the apartment located at the address: 2.
Important The apartment was handed over to the Tenant in a condition consistent with the terms of the contract. The tenant has no claims regarding the quality and other characteristics of the transferred apartment. 3.
Two (three) sets of keys to the entrance door to the apartment were handed over to the Tenant after signing this act directly at the location of the apartment. 4. At the time of signing this act, the apartment has the following shortcomings: 5.
Certificate of acceptance and transfer of apartment for rent
- Report of inspection of the accident site (apartment) Statements of claim, complaints, petitions, claims → Report of inspection of the accident site (apartment) ... in which the apartment building is located) (signature) m.p. (full name) "" 20 year inspection report of the accident site at the address "" 20 year commission consisting of: , (representative of the management body ...
- The act of delivery of an apartment to the tenant (to the residential lease agreement) The residential lease agreement → The act of delivery of the apartment to the tenant (to the residential lease agreement) the act of delivery of the apartment to the tenant Moscow June 10, 1992 we, the undersigned, the lessor, Valery Alekseevich Kuznetsov, ...
- Sample. Pledge agreement for an apartment owned by the mortgagors to ensure repayment of the loan amount under the loan agreement Pledge and mortgage agreement → Sample.
Certificate of Completion of Renting an Apartment to the rental agreement No. dated " " 20 Moscow " " 20
We, hereinafter referred to as the Lessor, on the one hand, and hereinafter referred to as the Tenant, on the other hand, have drawn up this act as follows: 1. Due to the expiration of the lease agreement for the Apartments located at the address:
Moscow, hereinafter referred to as the Apartment, the Tenant handed over, and the Landlord accepted the Apartment, the keys to the Apartment, as well as the Property in accordance with the Certificate of Transfer of the Apartment and Property dated "" 20 2.
The condition of the Apartment during the period of temporary paid ownership and use by the Tenant has deteriorated beyond the normal wear and tear and depreciation rate, including: 3. Serviceability, taking into account natural depreciation, and the completeness of the Property located in the Apartment corresponds to that specified in the Certificate of Transfer of the Apartment and Property, including: 4.
Download the acceptance certificate for completed work
- Next, each room is described in detail with an assessment of the floor, ceiling walls, windows and doors. If a piece of wallpaper is torn off on the wall, they write.
- The act must indicate plumbing items, heating radiators, various meters, lighting fixtures, indicating their serviceability, and an assessment of their condition.
- The next item could be a listing of pieces of furniture and household appliances, indicating the degree of wear.
- Next, the fact of transfer of access items (keys) to the apartment, basement, garage, entrance is confirmed.
- The submitted documents are indicated: the contract itself, the landlord’s personal account number, etc.
- Completion is completed by indicating the date and signatures of both participants.
- Don’t be shy about pointing out the shortcomings you find, hurry up and reflect only general information in the document.
Source: https://sv-groups.ru/akt-priema-sdachi-kvartiry-posle-remonta/
Apartment transfer acceptance certificate
In the case of renting a residential premises, a deed is signed between the owner and the tenant. Blanker.ru At the same time, there should be no other property on the premises at the time of signing the act.
- Naturally, the former residents should have already checked out and moved out of the premises.
- Any defects found should be recorded and the time frame for their correction by the seller should be indicated.
- After signing the deed, the keys are transferred to the new owner of the property.
- From this moment, responsibility for the maintenance of the apartment, its maintenance, payment of utility bills and other services passes to the buyer. Reflection of the defects of the apartment and their elimination Defects found by the buyer are necessarily reflected either in the act itself or in an appendix to it. There are some nuances here:
Sovetnik36.ru
- condition of the apartment - type of repair (major, cosmetic), list of amenities that are available in the apartment: electricity, telephone, hot water, central heating, running water, etc.
- technical condition of the premises’ structures: floor, windows, walls, ceilings, doors, balcony;
- a list of defects found during the technical inspection of the apartment;
- passport details of the seller of the residential premises;
- passport details of the buyer of the residential premises;
- signatures of the seller and buyer;
- seal imprint of a construction company.
Interesting: If the statute of limitations has expired on the loan, the Apartment Acceptance and Transfer Certificate is a document, the preparation of which is necessary to officially confirm the fact of transfer of the residential premises (apartment), as well as the responsibilities associated with its maintenance.
Acceptance certificate for apartment renovation work
Perhaps the party receiving the property wishes to note the technical condition of the received object.
- Signatures of the parties indicating last names and initials.
- When transferring an apartment building to the management company, an inspection of all technical premises is carried out so that in the future there will be no disputes regarding their condition. Based on the results of the inspection, a report is drawn up, which describes the degree of wear of communications and existing faults. sample apartment rental acceptance certificate The amount is displayed in numerical format and duplicated in words (as an additional decoding). In what cases is it necessary to fill out an acceptance certificate for the transfer of an apartment. The keys to the apartment and a package of documents suitable for submission are attached to the act. After the procedure for registering the right of ownership, the apartment goes to the buyer for complete disposal.
Certificate of acceptance of transfer of a renovated apartment
- Acceptance certificate for completed work
- Certificate of acceptance of premises after renovation
- Certificate of acceptance and transfer of apartment for rent
- Download the acceptance certificate for completed work
Acceptance certificate for completed work The more detailed the report is drawn up, the fewer disputes will arise in the future. The best option would be to draw up a detailed report by the owner himself in advance, followed by checking point by point and making amendments by the employer.
Who signs? The contract is signed by the person transferring the apartment for use - the landlord. And the person receiving it is the employer. If for some reason one of the participants cannot be present when drawing up the act, his interests can be represented by another person for whom a notarized power of attorney will be issued.
However, it is better when the signatures in the agreement and the signatures under the deed are the same.
Organoid.ru: everything about banks, credits, loans and other useful things
- the cost of work performed or specified services, including mandatory VAT;
- details of the customer and contractor;
- signatures and seals of the parties.
Limited Liability Company "", hereinafter referred to as the "Customer", represented by the Deputy General Director for Commercial Issues, acting on the basis of Power of Attorney No. dated "" 201_, on the one hand, and Open Joint Stock Company "" (short name - OJSC " "), hereinafter referred to as the "Contractor", represented by the General Director, acting on the basis of the Charter, on the other hand, collectively referred to as the Parties, have drawn up this act on the following: Form of the acceptance certificate for work performed 2016-2017 Documents can be transferred by one legal entity by another person under a contract, by an employee in the event of his transfer to another position, upon dismissal, liquidation of a structural unit, etc.
Certificate of acceptance of transfer of apartment after renovation sample
Important These are almost always powerless. (G. Flaubert) © 2011 - 2019 Sample contracts On our website, everyone can download for free a sample of the contract or sample document of interest; the database of contracts is updated regularly. Our database contains more than 5,000 contracts and documents of various types.
If you notice an inaccuracy in any agreement, or the impossibility of the “download” function of any agreement, please contact us using the contact information. Have a good time! Today and forever - download the document in a convenient format! A unique opportunity to download any document in DOC and PDF absolutely free of charge.
Only we have many documents in such formats.
This will deprive him of the ability to make claims to the builders regarding the deadlines. This document is double-sided and records when and what work was completed and accepted.
It should be noted that for a household contract, the acceptance certificate for completed repair work may have a more simplified form. O.), who is the owner of an apartment in the md. but after completion of the work, the customer, not being a specialist in the field of repairs, will begin to accept the manufactured volumes from experts.
According to this standard, information on the provision of services and the performance of work provided for in the list of services and works is reflected in the documents and is an integral part of the technical documentation of the NAMC. The acceptance certificate for completed work shows the types and types of work.
Source: https://sudacov.ru/2019/02/04/akt-priema-sdachi-kvartiry-posle-remonta/
Information on the act of return of residential premises. document to be signed after the end of the lease agreement
Renting buildings and premises is a serious procedure, which means that both the conclusion of an agreement and its termination are accompanied by documentation established by law.
Upon termination of obligations, a return act is drawn up between the tenant and the landlord.
In order to avoid mutual claims in the future, the parties must carefully approach the conclusion of this document, indicating in it all the necessary information about the property being returned.
At the end of the lease agreement, the tenant must return and the lessor must accept the premises that were rented out for use.
To record the fact that the premises are in proper condition, it is necessary to conclude a return certificate . This is not an independent document, but only an annex to the lease agreement, which contains:
- external condition of the premises;
- condition of windows, doors, floors and ceilings;
- state of the communication system.
Help: All changes made by the tenant or the landlord himself during the time the premises were in use and all deficiencies that appeared are also recorded.
The difference between acceptance and delivery after use from the acceptance certificate
From a practical point of view, it does not matter what name the document will bear: the acceptance certificate or the return certificate, if it describes all the nuances and shortcomings or their absence and indicates that the parties have no claims against each other.
document on completion of rental of apartment and property
Contains the name of the document, the date and place of its conclusion, information about the parties terminating the lease agreement and a link to the lease agreement.
- Main part.
It contains provisions about the property (including the exact address and cadastral number) and the condition of the returned premises (appearance, condition of communications, windows and doors, etc.), and also records all the shortcomings discovered by the landlord during the inspection.
This point is of a pretentious nature. The parties can specify the time frame within which deficiencies must be eliminated, impose sanctions for failure to eliminate them on time, etc.
- Signatures of the landlord and tenant with a transcript.
For reference: In accordance with paragraph 2 of Art. 655 of the Civil Code of the Russian Federation, the return of a building or premises is carried out according to a document signed by the parties.
Otherwise, the court, referring to this rule, will identify a violation and cancel the termination of the transaction, since, in fact, the return of the property has not been made, and, accordingly, the court will also not consider the lessor’s claim regarding its inappropriate condition.
Important
- The law does not establish the procedure for filling out the act of returning the premises, so it does not matter whether the document is drawn up on A4 sheet or on the landlord’s letterhead, if any.
- The act is drawn up in 2 copies (originals, not copies), one for each party.
- The acts must be signed by the parties! The absence of signatures entails the recognition of the document as invalid.
- If the premises were leased by a legal entity, then the data in the act must be reflected in the organization’s documentation journal.
How long to store?
The storage time depends on the period of time established for storing the lease agreement itself (by law or local regulations of the lessor organization).
Important! If the contract or legal regulation does not specify a period, then the minimum storage period is 3 years from the date of termination of the contract (since this is the limitation period if defects were discovered during the return of the premises and the receiving party decided to go to court).
What papers can be attached?
This may be certificates and information about the parties’ fulfillment of the conditions established by the lease agreement, for example:
- receipts for payment of housing and communal services;
- receipts for payment of rent on time;
- claims acts sent by the parties to each other.
The tenant and the landlord can attach other documents, for example, a certificate from the Unified State Register of Real Estate, stating that at the time of signing the deed, the encumbrance in the form of a lease was removed from the premises.
If not drawn up and signed?
If the dispute between the parties who did not draw up the act reaches the court, the following may happen:
- The claim will not be accepted due to the lack of necessary documentation.
- If the claim was nevertheless accepted, the absence of a return certificate will be discovered during the consideration of the case, and the court will not satisfy the plaintiff’s demands.
- In court, the absence of an act will serve as the basis for canceling the termination of the lease agreement.
The absence of signatures entails the recognition of any document as invalid, i.e., the termination of the lease agreement will also be canceled in court.
Unilateral termination
The landlord may require the tenant to leave the property (Article 619 of the Civil Code of the Russian Federation) if:
- the rules of use were violated (for example, the contract established a smoking ban, and the tenant systematically violated it);
- he significantly worsened the condition of the premises and did not carry out major repairs within the period established by the contract, if so provided for in the contract;
- Rent was not paid on time more than 2 times in a row.
The tenant also has the right to initiate early termination of the transaction (Article 620 of the Civil Code of the Russian Federation):
- the landlord creates obstacles to the use of the premises (does not give up the keys, continues to use the premises if the latter is not established by the contract, etc.);
- the premises have shortcomings (terrible condition, repairs required, etc.) that were not discussed and were not discovered by the tenant during a personal inspection before the transaction was concluded;
- the lessor (if provided for in the contract) does not carry out major repairs on time;
- use of the premises is impossible due to its condition.
Conclusion
To terminate the lease agreement, the parties, in accordance with Art. 655 of the Civil Code of the Russian Federation, they must draw up an act of return of the premises to the landlord, recording its condition, discovered deficiencies that appeared due to the fault of the tenant.
This document is proof of the termination of obligations between the parties and serves as the basis for filing claims in court if the parties were unable to agree peacefully on the procedure for compensation for damage caused.
, please select a piece of text and press Ctrl+Enter.
Source: https://expravo.com/zhilishhnoe-pravo/kvartira/arenda-kvartiry/dokument/aktu-vozvrata.html
How to draw up an acceptance certificate for repair work: sample, template
Drawing up an acceptance certificate is mandatory only when fulfilling the terms of construction contracts. In other cases, the parties themselves decide on the need for such a document to confirm the fact of acceptance of the work.
Such an act is necessary for taxation and accounting purposes: with its help, the moment of recognition of expenses is determined. By drawing up an act, the taxpayer takes into account the costs of paying for services and work received when determining the taxable profit of the enterprise.
But this document also has other important functions that make its execution mandatory for all parties.
How to draw up such an act
An organization can independently develop forms of acts, although there are approved uniform forms, for example:
After the repair work is carried out and completed by the contractor, in the absence of any claims or complaints from the customer regarding the volume, timing and quality of the work, the parties draw up a document about this. It is called an act of completion of repair work.
The performer (contractor) undertakes to carry out repair work and hand over the results of this work to the customer. If the result is not achieved, then the work is considered unfinished.
An example of an acceptance certificate for completed work
The procedure for drawing up an acceptance certificate when performing repair work
This act is drawn up in two copies and becomes an annex to the main agreement, which was drawn up by the parties before performing the work. From the moment the contract is signed, contractual relations are established between the two counterparties.
The act contains clauses on the terms of the contract and the execution of work, the obligations of the parties and sanctions in case of failure to fulfill the terms of the transaction and is confirmation that the parties have fulfilled their obligations.
If the contract does not provide for the mandatory drawing up of an acceptance certificate for the repair work performed, this does not mean that the customer can evade payment for the work performed by the contractor for this reason.
Structure
Each party receives a copy. You can use a standard form, download it on the Internet, or develop it yourself.
The repair work acceptance certificate contains the following points:
- name of the document, its serial number and date of preparation;
- list of works and services indicating deadlines for completion;
- reference to the primary contract indicating its name, number, date of preparation;
- cost of work performed (including VAT) in monetary and in-kind terms;
- details of the parties to the agreement.
Also:
- The document is certified by the signatures and seals of the customer and the contractor, and the full names and positions of the persons who signed the act should be indicated. If the document concerns individuals and not legal entities, then seals are optional.
- The document can be drawn up in any form, there are no strict requirements, the only condition is the mandatory entry of all details and other information about the parties to the agreement,
- In addition, you must enter the number and date of the agreement to which this act is an annex. When signing a contract, it is necessary to include in advance the text of the contract stating that the work will be accepted according to the acceptance certificate.
- The act should list all the work and services specified in the contract, indicating their prices. If several works or services were supposed to be carried out, they can be entered into one act in the form of a table. If desired, you can draw up a separate act for each type of work or service.
Important Terms
All data in the act must not conflict with the information in the contract. The signed act confirms that:
- The parties have no claims against the other party to the contract.
- The customer undertakes to pay in full for the work performed.
- The Contractor guarantees the quality of the work or services performed.
The absence of an act may result in penalties due to the fact that it is contrary to tax legislation and accounting requirements. And this leads to incomplete tax accrual.
App car for repair
Legally, such an act confirms the fact that the car has been transferred to another person for the duration of the repair. It can be drawn up on a separate form or as a clause in the contract. When filling out the form, in addition to the generally accepted items, you must include:
- car description : production date, make, color, engine and body numbers;
- some technical characteristics : mileage, equipment, description of defects.
When submitting for repair, you should indicate the breakdowns that need to be repaired and the parts that need to be completely replaced. It is necessary to list all faults, even those that are not planned to be eliminated. This is necessary to prevent possible claims in the future.
If during the repair a new defect not specified in the report is discovered, the owner must be notified about this. If he does not agree to repair this breakdown, it is necessary to draw up another written document about this.
When handing over the car, you must provide a document confirming the ownership of the car, a service book and a warranty card, if the warranty period has not expired.
Sample act of PP car for repair
Appendix of completed renovation work
This act is an integral part of the contract for repair work. It will protect the interests of all parties to the contract.
In its absence, an unscrupulous customer may, for example, indicate work that was not planned and refuse payment for this reason.
And the performer may not perform some actions that were planned during the oral agreement, or may do them in bad faith and of poor quality, in violation of the deadlines. Drawing up an act will allow you to avoid such moments.
The execution of such an act must be taken very seriously; it must be drawn up in accordance with the provisions of the law. This is especially important for the customer, who involves him in accounting and tax reporting.
You can use a standard form that is available on the Internet. Usually in such cases the standard KS-2 form is used. Moreover, all legal entities are required to apply this form, regardless of their form of ownership.
such an act can be found here.
Appendix of completed renovation work
KS-2
This is one of the most common forms of acts and is used most often. The following items must be filled in:
- object and subject of the contract;
- information about the agreement on the basis of which the act is drawn up;
- the amount of work planned to be performed;
- the period within which the work must be completed;
- requirement for work performance;
- costs and their justification;
- payment amount.
Both parties sign the document. If one of them refuses to do this, this must be noted in the text of the contract. A unilateral act is drawn up. It has legal force and serves as confirmation of completed repair work.
If the customer is unwilling to sign the act and pay for the work, the contractor has the right to go to court to force him to pay the cost of the work and sign the act.
If desired, you can enter additional items into the standard form, but changing the data already entered is prohibited. If it is necessary to make any adjustments, an order to this effect is drawn up.
You cannot reflect the volume of work as a percentage, indicate contractual coefficients, and all amounts must be reflected in rubles. For household contracts, you can use a more simplified form of the act of performing repair work. KS-2 is here.
Example KS-2
Act of hidden work
Such an act is drawn up after repair, finishing and construction work has been carried out, which will be hidden during subsequent work on this site. When drawing up such an act, the customer, the contractor and a representative of the designer’s supervision of responsible work are present.
This act concerns the installation of insulation, waterproofing, utilities, sealing of balconies and lintels, fastening of structural elements, and installation of foundations for floors.
The report is drawn up after inspection and certification of the work by a special commission. If there is an act, payment is made by the customer, if there is no certificate, payment is made by the customer. Therefore, having such a document is very important.
The form for the inspection of hidden work can be downloaded here.
An example of a hidden work inspection report
Up after a major home renovation
When carrying out major repairs, an inspection report is drawn up, the condition of the object at the time of drawing up the report and the measures that should be taken must be indicated. An act is drawn up for buildings and structures of any purpose, the inspection is carried out visually, although if necessary, a more thorough inspection can be carried out.
The act is drawn up by a special commission, which is appointed from among the most qualified specialists or experts, and representatives of interested parties are also present.
In order for such a document to have legal force, the following rules must be adhered to:
- Enter the date of compilation.
- Indicate the address of the location of the object and its name.
- Its condition at the time of drawing up the act.
- Purpose of the survey: major repairs.
- A list of actions to accomplish this goal, a detailed listing of all actions performed in separate paragraphs.
- The composition of the commission, indicating the positions and the company it represents.
- The result of the examination.
Particular attention is paid to load-bearing structures. All identified defects are indicated in the document, listing their possible causes. The following are recommendations from experts.
If no defects are found, the object meets all standards, you should limit yourself to recording this. If any of the commission members disagree, he/she enters his/her opinion with detailed justification in a separate paragraph.
The act is accompanied by accompanying documents: links to photos, videos, expert opinions. The number of copies depends on the number of interested parties. Signed by all commission members. There is no need to certify with seals.
Useful information on the act of acceptance of an object after repair is given in this video:
Source: https://uriston.com/kommercheskoe-pravo/dokumentatsiya/akty/priem-peredacha/pri-remontnyh-rabotah.html
Features of apartment acceptance depending on the finishing option
There are several types of finishing for residential premises.
The so-called rough finishing provides for the existence of entrance doors in reality, the arrangement of the building with a water supply and sewerage system, the installation of water and electric meters, and the installation of double-glazed windows on the windows.
During pre-finishing, the apartment must be prepared for final finishing work. This means that the walls of the apartment must already be plastered, the floor has a clean screed, water supply systems, sewerage and heating equipment must be installed, and all sockets and lampshades must be in working order. In apartments with the specified finishing, the entrance doors are already in place, the windows and balconies are fully glazed.
A clean, turnkey finish allows residents to move in without any delay.
Rough and pre-finishing
Someone makes a purchase of an apartment in a state of rough finishing. In this option, the equipment set must correspond to that specified in the contract.
Many buyers, for various reasons, most often financial, give preference to housing that has been pre-finished.
During this transaction, it is necessary to strictly check the quality of the plaster, the quality of the screed, glazing and the technical condition of utilities.
When considering plastering walls and ceilings, you need to focus on the following requirements: complete absence of cracks, various peelings, and traces left from tools on the surfaces. That is, the surfaces of both walls and ceilings must be flat, smooth, the permissible deviations are completely insignificant up to 1-2 mm.
Regarding the concrete screed, minor deviations are allowed taking into account the future floor covering:
- under laminate or linoleum coating, an error of up to 2 mm is possible;
- for finishing tile material - up to 6 millimeters;
- The discrepancy between the floor and the horizontal level should not exceed 2%, regardless of the size of the room.
Window and door sashes made of metal plastic must open and close freely; various scratches, cracks and other damage must not be allowed on glass surfaces or window sills. The window sill in residential premises should not cause difficulty in accessing heat from the heating system.
The ideal heating system option involves equipping it with Mayevsky taps designed to release air and installing temperature controllers. Installation of radiators requires compliance with certain parameters established by the building standard.
Turnkey finishing
Thorough, elite finishing leaves no problematic issues, because before the finishing work begins, all the subtleties are discussed with the craftsmen down to the smallest detail. But even under such scrupulous conditions, one should not naively trust words and promises.
Lawyer consulting
FREE CONSULTATIONS | REPRESENTATION IN COURT | PREPARATION OF DOCUMENTS |
Unilateral act of acceptance of transfer - Tricks of the developer
Detailed analysis of the video and our comments on it:
Neither the seller nor the buyer will ever know that their transaction is not entirely complete from the standpoint of the Civil Code. However, in some cases, the absence of an APP can play an unpleasant joke on one of the parties. We have already mentioned possible misunderstandings with rent and damage to finishing, but more serious problems may arise.
This document is important for each of the parties. It will allow the buyer to receive the apartment in proper condition, and the seller will be free from the risk of damage. Why do you need a transfer deed? Drawing up and signing a transfer deed completes the purchase and sale transaction of a real estate property.
How is the responsibility of the participants distributed after signing?
The deed is drawn up as a separate document if a certain amount of time passes from the moment of the transaction to the date of transfer of the property. If during the operation of the rented square meters the tenant causes any damage to them, he will have to assume compensation for material damage.
Guarantee of quality work on time or refund. Prices even for website development start from 500 rubles. General rules of office work recommend dividing documents into introductory and main parts.
A link to the document on the basis of which the initial design data was issued is provided.
A document that certifies the status of non-residential real estate that is transferred for rent or ownership - an act of acceptance and transfer of non-residential premises.
The act of acceptance and transfer of the apartment It is important that they do not contradict existing laws. Attention Even the contract itself is registered only if it is concluded long-term, and the act is just an addition to it. At the moment, a transfer from residential real estate to non-residential real estate or vice versa is popular, depending on which status is more profitable for the owner. Thus, the act is not independent, but serves as an annex to the main document. The major renovation was carried out on time.
The sample work acceptance certificate in the introduction must contain a link to the details of the contract, which is the basis for its execution. The composition of the commission is also indicated here if the nature of the services provided requires their acceptance by several specialists.
With a simplified transfer procedure, it is enough to enter the details of the persons responsible for signing the act. The main part of the document includes a list of transferred works, their content, and, if necessary, reveals the stages of their implementation.
The commission's findings are recorded here.
If significant deficiencies are discovered that cannot be immediately corrected and have a negative impact on the operation of the facilities, the customer has the right to refuse to accept the work and not sign the report.
By agreement of the parties, the acceptance and transfer protocol may contain detailed information for each item, for example, not only the agreed volume of services, but also their detailed description with an indication of cost.
How to correctly draw up an acceptance certificate The procedure for accepting work and the timing of its implementation are determined by the provisions of the relevant agreement. Thus, an act can be drawn up upon completion of the entire scope of work provided for in the agreement, but in the case of stage-by-stage implementation, it is advisable to document the completion of each stage separately.
For example, first formalize the completion of the project development by the contractor, and at the next stage - completion of the installation of the facility.
Expert help with inspecting a new apartment
Sometimes it happens that representatives of a construction company are in a hurry and rush clients to make a decision. With such a rush, vigilance is lost, and errors and shortcomings in the work of builders are easily missed. Experts recommend inspecting every nook and cranny of the new building without fuss.
You need to listen carefully to the advice of experts, and it is best to invite a specialist from an independent expert organization who will competently inspect the apartment and issue its owner an official document, which should contain information about the claims that have arisen, indicating specific defects with reference to construction standards approved by the state commission.
Of course, the expert’s services are paid, but their cost will be significantly lower than the costs of possible repairs in the home, which may occur in the future due to an unprofessional approach to the inspection.