Construction permit for individual housing construction (Notice of planned construction)


Documents for obtaining permission to build a house

How to obtain permission to build a house? First of all, you need to collect a package of documents. This stage is the longest. So, what papers will you need:

  • Documents confirming the ownership of the site.
  • Project documentation.
  • Documents confirming the identity of the applicant or his representative (passport or power of attorney certified by a notary).
  • Statement. You can fill it out in advance or when submitting documents to the MFC.
  • an extract from the Unified State Register of Real Estate to confirm ownership of the plot;
  • directly the title document.

This may be a contract of sale, gift, or rent, which confirms the transfer of ownership. Or a certificate that the land on which it is planned to build has been inherited.

The extract can be obtained from the multifunctional center or from Rosreestr. You'll have to pay for it. For individuals the cost is:

  • 300 rub. for the paper version;
  • 150 rub. for an extract in electronic form.

Costs vary for organizations. Ordering an extract is available not only during a personal visit, but also remotely through the Rosreestr website.

If the object planned for construction does not fall under individual housing construction, then quite a lot of documents need to be prepared:

  • explanatory note;
  • a site plan indicating not only the location where the facility will be located, but also the passage and access roads to it;
  • diagram of the site with maximum distances from other objects marked in red lines;
  • architectural design of the facility planned for construction;
  • if necessary, a project for the demolition or reconstruction of a building located on the construction site;
  • architectural plan of the local area;
  • permission to deviate from certain parameters;
  • engineering design indicating communication connection points;
  • accessibility project for disabled people - necessary if social premises will be built;
  • expert opinion on design documentation;
  • consent of the owners of the building to carry out reconstruction, if necessary.

How to obtain permission to build an individual housing construction house? In this case, much less documents are required:

  • land plot plan. You can get it at the BTI. It must be received no earlier than 3 years before the start of processing permits;
  • a description of the appearance of the building if it is erected in historical places, since it must fit into the general appearance;
  • plot diagram indicating the location of the house;
  • conclusion of the design examination.

The conclusion can be obtained not only from a state institution; it can also be made by private organizations, but they must be accredited. Therefore, along with the expert opinion, it is necessary to take from them a certified copy of the document that confirms the current accreditation.

You can fill out a ready-made form at the multifunctional center. However, it is allowed to write the application in advance independently using the sample.

  • Indication of the position and full name of the decision maker in the construction region. As a rule, this is the head of a district or subject of the Russian Federation. You can clarify this information at the MFC or on the official website of the region.
  • Entering information about the applicant - full name, registration address and passport details. It is also recommended to indicate a telephone number, this will ensure quick communication if necessary.
  • Specifying the title of the document. There are two permit options in the application; you need to highlight the correct one (construction).
  • Indication of the necessary information - a list of work planned for carrying out, the type of building being constructed, address, required period of validity of the permit. It is also necessary to enter the details of the document confirming the applicant’s ownership of the land.
  • Description of the main characteristics of the house. Among them should be the planned area of ​​the entire building, as well as individual rooms in it.
  • List of documents provided along with this application.
  • Signature and date.

If you fill out an application at the MFC, a specialist will enter most of the information into it. You will only need to check whether the information is entered correctly. Therefore, it is better to refuse to fill out the application yourself in favor of completing it at the place of submission of documents.

Who can obtain a building permit

Developers can be both individuals and legal entities who have ownership rights to land plots located in places where the construction of individual residential buildings is permitted, including persons wishing to reconstruct an already built house.

In addition, legal representatives of such persons, with a power of attorney certified by a notary, as well as guardians and trustees of incapacitated citizens who have the appropriate rights, can obtain permission.

Necessity

The issuance of a permit for the construction of an individual residential building is regulated by Article 51 of the Town Planning Code.

ATTENTION! A permit is a document by which regulatory authorities confirm that a project or site plan meets the requirements of the Town Planning Code.

Expert opinion

Kurtov Mikhail Sergeevich

Practitioner lawyer with 15 years of experience. Specializes in civil and family law. Author of dozens of articles on legal topics.

It can be obtained from the local government administration. In some cases, you will need to contact other authorities:

  • When construction is planned on a site of historical value.
  • If the facility has an energy source powered by nuclear fuel.
  • In case of construction of an object related to the space sphere.
  • When used in the construction process of the lower layer of the earth's crust.

This is important to know: Indexation of pensions in 2020: table

In such cases, you will also need to contact authorities related to certain features of future construction.

It is the receipt of permits that will begin the process of building a new home. Such documents confirm that the design documentation meets building regulations and urban planning plans. With a permit in hand, you can begin the first stages of development without fear of inspections or questions from regulatory authorities.

Without permission, buildings can be erected on plots that are allocated for summer cottages, gardening, or gardening. You can also build a garage without this document, which will be used only for personal, non-commercial purposes. The necessary approval for construction work is issued after the State Expertise.

ATTENTION! Permits are of great importance. Each construction project must be safe and meet building codes. It should not pose a threat to the environment, life or health of people.

When approving a construction project, the inspecting authorities clarify to what extent the project meets the building and urban planning codes, the requirements of the sanitary and epidemiological service, fire safety rules, and technical supervision standards. If there are errors in the design or deviations from the required standards, permission for construction work will not be obtained.

Documents for obtaining permission to build a house

How to obtain permission to build a house? First of all, you need to collect a package of documents. This stage is the longest. So, what papers will you need:

  • Documents confirming the ownership of the site.
  • Project documentation.
  • Documents confirming the identity of the applicant or his representative (passport or power of attorney certified by a notary).
  • Statement. You can fill it out in advance or when submitting documents to the MFC.
  • an extract from the Unified State Register of Real Estate to confirm ownership of the plot;
  • directly the title document.

This may be a contract of sale, gift, or rent, which confirms the transfer of ownership. Or a certificate that the land on which it is planned to build has been inherited.

The extract can be obtained from the multifunctional center or from Rosreestr. You'll have to pay for it. For individuals the cost is:

  • 300 rub. for the paper version;
  • 150 rub. for an extract in electronic form.

Costs vary for organizations. Ordering an extract is available not only during a personal visit, but also remotely through the Rosreestr website.

If the object planned for construction does not fall under individual housing construction, then quite a lot of documents need to be prepared:

  • explanatory note;
  • a site plan indicating not only the location where the facility will be located, but also the passage and access roads to it;
  • diagram of the site with maximum distances from other objects marked in red lines;
  • architectural design of the facility planned for construction;
  • if necessary, a project for the demolition or reconstruction of a building located on the construction site;
  • architectural plan of the local area;
  • permission to deviate from certain parameters;
  • engineering design indicating communication connection points;
  • accessibility project for disabled people - necessary if social premises will be built;
  • expert opinion on design documentation;
  • consent of the owners of the building to carry out reconstruction, if necessary.

How to obtain permission to build an individual housing construction house? In this case, much less documents are required:

  • land plot plan. You can get it at the BTI. It must be received no earlier than 3 years before the start of processing permits;
  • a description of the appearance of the building if it is erected in historical places, since it must fit into the general appearance;
  • plot diagram indicating the location of the house;
  • conclusion of the design examination.

The conclusion can be obtained not only from a state institution; it can also be made by private organizations, but they must be accredited. Therefore, along with the expert opinion, it is necessary to take from them a certified copy of the document that confirms the current accreditation.

You can fill out a ready-made form at the multifunctional center. However, it is allowed to write the application in advance independently using the sample.

  • Indication of the position and full name of the decision maker in the construction region. As a rule, this is the head of a district or subject of the Russian Federation. You can clarify this information at the MFC or on the official website of the region.
  • Entering information about the applicant - full name, registration address and passport details. It is also recommended to indicate a telephone number, this will ensure quick communication if necessary.
  • Specifying the title of the document. There are two permit options in the application; you need to highlight the correct one (construction).
  • Indication of the necessary information - a list of work planned for carrying out, the type of building being constructed, address, required period of validity of the permit. It is also necessary to enter the details of the document confirming the applicant’s ownership of the land.
  • Description of the main characteristics of the house. Among them should be the planned area of ​​the entire building, as well as individual rooms in it.
  • List of documents provided along with this application.
  • Signature and date.

If you fill out an application at the MFC, a specialist will enter most of the information into it. You will only need to check whether the information is entered correctly. Therefore, it is better to refuse to fill out the application yourself in favor of completing it at the place of submission of documents.

How to get permission to build a house in 2020

How to get permission to build a house in 2020
Many people dream of building an individual country house, which will take into account all the requirements and preferences, but refuse to realize their dream due to their reluctance to deal with obtaining a building permit. But there is nothing difficult in obtaining this document, and in some cases it is not even required. A building permit is a document certifying the compliance of the project documentation with the established requirements of the urban planning plan of the land plot. A building permit includes site organization plans that indicate the location of a residential building or residential facility. The permit confirms the right of the developer to construct an individual dwelling on a specific plot of land.

The legal framework for registering and obtaining permission to build an individual dwelling is described in Article 51 of the Town Planning Code of Russia.

When to apply for permits and when not to

Having decided to start building an individual home, first of all you need to decide whether in your case you need to obtain a permit or not.

According to the legal framework, this issue is primarily regulated by the type of permit issued for the land plot being used. If the site was initially provided for the purpose of individual housing construction, then obtaining a permit is necessary. If the permit for the land plot states that the property is being provided for dacha (garden) activities, then there is no need to issue a building permit.

The type of construction project is also important.

According to the law, if you plan to build an object that is not related to any type of capital construction, for example, a garage, or a building for auxiliary use, then a permit is not required to carry out this activity.

In addition, there is such a thing as a “dacha amnesty”

, according to which, in order to register ownership of an individual housing (object) located within the boundaries of a settlement, the purpose of which is to run a personal household, it is not necessary to obtain permission to put the object into operation. But in order to formalize the commissioning of the facility, the set of required documents must include a construction permit.

As follows from the standards of the “dacha amnesty”, in order to register ownership, documents are required confirming the fact of the creation of the object, in which its descriptions are indicated. However, until March 1, 2020, the only document used to confirm the creation of an object in the form of individual housing, containing its description, is a cadastral passport. From which it follows that if you complete the construction of an individual residential building and manage to submit documents for its state registration before March 1, 2020, then you will not need to obtain a permit.

But the above rules only apply if you do not intend to make transactions with unfinished housing, because To register an object belonging to the type of unfinished construction, a permit will in any case be required.

List of documents for obtaining permission to build an individual residential building in 2020

To begin the process of obtaining a permit to build an individual dwelling, you must submit an application to the authority responsible for issuing them. In addition to the application, you must provide a set of the following documents:

  • package of title documents for the land plot;
  • original urban planning plan of the site;
  • a planning diagram for the organization of a land plot, which indicates the location of an individual dwelling.

However, according to the regulations, officials do not have the right to demand any other documentation from you.
Where can a permit to build an individual house be obtained?

Several government bodies are involved in issuing permits for the construction of individual housing in 2016:

  • local government;
  • executive power of a constituent entity of Russia;
  • federal executive body.

Most often, the issuance of permits for the construction of an individual country house is carried out by the local government body to which the land plot being used belongs at its location.
As a rule, such a body is the administration of the municipal district. Why are they denied permission to build an individual home?

Officials authorized to issue permits of this type first of all check the availability of all required documents, the correctness of the planning organization of the site, the designation of the location of the residential building and the compliance of the provided data with the norms of the urban planning plan.

If the applicant has provided a complete set of documents in which no inconsistencies are identified, within a ten-day period after contacting the authorized body, he will be issued a permit to construct an individual house.

If you were refused permission, officials are required to provide you with a reasoned refusal in writing. Most often, the issuance of a permit is refused due to the provision of an incomplete set of documents, or because the documents do not comply with the requirements of the urban planning plan of the land plot.

If a permit is refused, you can challenge the decision in court. However, for this you will need to provide a document confirming receipt of the refusal.

When contacting the authorized body to obtain a construction permit, remember that, according to the Town Planning Code, this document is issued free of charge. Also note that 10 years after issue, the permit will become invalid.

Easy scheme

If the structure does not have more than two floors, its total area does not exceed 300 square meters, approval for the work is issued according to a simplified procedure.

Most often it is used in the construction of cottages, dachas, and country houses. And also, according to a simplified procedure, a package of documents is issued with a permit for the construction of agricultural buildings.

What is needed to obtain approval in this case?

  1. We need a sketch of a future project.
  2. A special construction passport is required.
  3. Information about upcoming construction work is submitted to the Inspectorate.

This is important to know: Is it possible and how to sell an apartment purchased with a mortgage and buy another one?

When not required

Permits are not required for the construction of auxiliary facilities. Also during the construction or reconstruction of real estate that is not classified as capital facilities. For example, when building a kiosk.

You can build a garage for personal use without permits.

Another type of work without approval is changing capital objects without affecting the structure. Such work should not pose a risk to the integrity of the building.

Reasons for refusal

Expert opinion

Kurtov Mikhail Sergeevich

Practitioner lawyer with 15 years of experience. Specializes in civil and family law. Author of dozens of articles on legal topics.

Before buying a plot for construction, including individual housing construction, you need to know exactly its category and type of permitted use. It is possible that the land is not initially suitable for the purpose and a building permit will not be obtained.

Local authorities will also give a negative answer if not all documents have been collected, if the project and other technical documentation does not meet construction and other standards. The reason for the refusal must be known to the applicant.

If the applicant believes that he was denied unreasonably, he can appeal the decision in court.

Types of punishment for breaking the law

There is a list of objects the construction of which can be carried out without approval. But in other cases, you must comply with the requirements of the Town Planning Code. Any piece of real estate cannot be hidden; sooner or later the local administration and regulatory authorities will know about the erected building.

ATTENTION! Each new construction site can become a threat to the environment, the sanitary condition of the area, and represent safety for people.

Therefore, the construction design and other aspects must be carefully checked. Construction without permission will be punishable by a fine. In some cases, the court may order the demolition of the erected building.

When purchasing land for individual housing construction, the main question arises about where to get permission to build a private house on your site. Some people believe that purchasing a plot in itself is enough to start building their future home.

Is it so? Is it generally necessary to obtain a permit to build a house and, if so, in what situations? You will learn about this, as well as familiarize yourself with the list of documents that are required for the construction of a private house on your own site, in particular to obtain permission and where to actually obtain it, from this article.

Permit for construction of individual housing construction: definition and legislation

A permit for the construction of individual housing construction is a document that confirms the compliance of the proposed construction (its design documentation) with the planning and land surveying plan. Construction must be carried out taking into account the type of permitted use of the site and the established restrictions.

Permission is issued by authorities authorized to supervise and control the construction industry. After receiving this document, you can legally begin construction or reconstruction of the facility.

The procedure for obtaining a construction permit is determined by the norms of the Town Planning Code, Order of the Ministry of Construction of the Russian Federation 117 (On approval of the form of permission to commission a facility), local regulations and municipal regulations for the provision of public services.

The importance of a timely issued construction permit cannot be overestimated.

From 2020, it will be impossible to legitimize a building and register it with the cadastral register without having this document in hand (today it is still possible to register a building on the basis of the owner’s declaration).

Without this document, difficulties will arise when registering and connecting to communications.

In addition to obtaining the legal right to build a house on the site, thanks to the permit, the land owner does not have to fear that penalties will be imposed on him for unauthorized development, and he does not face legal disputes about setbacks from boundaries and territorial disputes.

Owners of maternity capital will also need official permission to build a house to transfer funds to the developer’s account.

Under what circumstances is a permit required to build a private house?

Permission to build a house on your own plot is a document that grants the right to build a private house on a plot of land.

Sample permit to build a house on your own plot

It is mandatory to obtain permission if your future construction will be located on land plots of the following categories:

  • Individual housing construction - individual housing construction
  • MZhS - low-rise housing construction
  • Private subsidiary plot - personal subsidiary plot

If the land on which you plan to build your future permanent residence falls into one of the above categories, then obtaining permission is mandatory. Without it, your building will be considered illegal and may be subject to demolition. And also, subsequently you will not be able to register ownership of the constructed residential building.

If you plan to build a house on the territory of SNT, i.e. on lands for gardening and summer cottage farming, there is no obligation to obtain permission.

Another circumstance in which you should think about drawing up the above document may be:

  • obtaining a loan from a bank to build your home

Not always and not every bank requires this document when applying for a loan, however, such a possibility exists. If this is your case and you plan to use borrowed funds to build your home, it is worth obtaining a building permit in advance.

Construction permit for individual housing construction (Notice of planned construction)

A notification of compliance with the parameters specified in the notice of planned construction or reconstruction of an individual housing construction project (formerly a Construction Permit) of an individual residential building is a document allowing the commencement of construction work in relation to the designed residential building. The Notice of Compliance indicates the permissible parameters of the future object, its number of floors, area, percentage of site development and much more. Today, obtaining a building permit is mandatory in all cases, with the exception of construction on a land plot with a permitted use for dacha or garden farming. Receiving a Notification of compliance with the parameters specified in the notice of planned construction or reconstruction of an individual housing construction project is preceded by the stages of urban planning study, obtaining an urban planning plan (GPZU), and preparing a scheme for the planning organization of a land plot (SPOZU). If you have already started construction, or a residential building has long been built without permits, the construction of such a house will need to be legalized out of court or in court.

Experienced specialists will help you understand all the intricacies of issuing a notice of the planned construction of a residential building or its legalization, and will conduct urban planning studies regarding the possibility of construction and existing encumbrances on the use of the site.

Stages of receiving a Notification of compliance with the parameters specified in the notice of planned construction or reconstruction of an individual housing construction project:

  1. Urban planning study
  2. Obtaining an Urban Development Plan
  3. Development of a planning organization scheme for a land plot
  4. Submitting a notice of planned construction
  5. Receiving a Notification of compliance with the parameters specified in the notice of planned construction or reconstruction of an individual housing construction project

Documents that will be required from you to receive a Notification of compliance with the parameters specified in the notice of planned construction or reconstruction of an individual housing construction project:

  • Project documentation or architectural, preliminary design (if available)
  • Urban development plan (if available)
  • Planning organization diagram (if available)
  • Notarised power of attorney

Articles on the topic Land Surveying and Technical Planning:

Boundary plan of the site Clarification of the boundaries of the site Redistribution of land plots

Consolidation of land plots Division of land plot Technical plan (composition and procedure for registration)

How to register a house under the dacha amnesty? Decorating a house in SNT

Dacha amnesty in 2019 Important changes in the Dacha amnesty in 2020

The procedure for registering a garden and residential building under the dacha amnesty in 2019

To obtain a permit, you need to take into account a number of requirements for the future structure:

  • the future building, which is also your future family nest, should be intended for housing only 1 family
  • the structure must be three or less stories high, but the basement will not be taken into account
  • When building a house, you should take into account the restrictions and encumbrances that may be indicated in your certificate of ownership of the land.

The good news is that if your house will have three or fewer floors, then you only need to obtain a building permit and you can begin building the house.

The bad news is that if you plan to build a house higher than three floors, then you will need an additional state expert opinion.

Procedure

Before you begin directly designing your future home, a citizen will have to carry out three important activities:

  • Make sure that the land survey is correct and check the presence of all title documents for it;
  • Contact local authorities and establish rules for development on the territory of a specific locality;
  • Invite representatives of the design organization to draw up a technical plan for the future structure.

In the technical plan of a private house, not only it itself must be described, but also the infrastructure adjacent to it, in particular, basic communications. Regarding the latter, the municipal services of the corresponding city or town must give their opinion, which is attached to the plan.

In general, to obtain permission to build a private house you will have to prepare the following documents:

  • A written statement from the owner of the land plot on which the building is being erected;
  • Personal document with photo;
  • Papers certifying a person’s ownership of a land plot, which may be a passport of the object, an agreement for its sale or donation, etc.;
  • General plan of a plot of land, which can be obtained from local authorities;
  • A diagram of the boundaries of the land plot indicating the coordinates of the residential building;
  • Technical plan for building a house with a description of all communications.

All listed documents are transferred to the relevant department of local government of a given locality. The decision is made within 10 days and is provided in writing. In large cities this period may be slightly longer.

Cases of issuing a building permit

Permits for capital construction are issued in the following cases:

  1. If the construction project will be built on a plot of land that is provided to the user of the subsoil to carry out work on the use of these subsoil (permission is granted by the federal administrative body responsible for the state subsoil fund).
  2. If the object is a means of using atomic energy (the permit is submitted by an organization that is engaged in the use of atomic energy, as well as state management of the development, production and disposal of nuclear weapons and installations used for military purposes).
  3. If the object belongs to space infrastructure (according to Article 51 of the Civil Code of the Russian Federation, permission is provided by the State Corporation for the Activities of the Space Organization "Roscosmos").
  4. If the object relates to hydraulic structures of the second or first class, airports, aviation facilities, railway facilities, consulates, embassies, Russian missions abroad, defense facilities, security facilities ensuring the security of the Russian border, border facilities and others that are supposed to be built on the territory Russian continental shelf, maritime internal waters or territorial sea (permission is provided by authorized federal executive authorities).
  5. If the construction or reconstruction project is located within the boundaries of a natural protected area (according to Article 51 of the Civil Code of the Russian Federation, permission is provided by the executive authority at the federal or municipal level or the level of the subject).

This is important to know: Where to complain about the management company, sample complaint 2020

List of documentation required to obtain permission

The seventh part of Article 51 of the Code indicates what documents are needed for a construction permit. This list includes:

  1. Application from the developer.
  2. Title documentation relating to a piece of land.
  3. Urban planning plan for a plot of land.
  4. Materials contained in the design documentation.
  5. Explanatory note.
  6. A diagram-plan of a plot of land corresponding to the urban planning plan, indicating the presence of designations of the location of the construction site, as well as all approaches, entrances to the construction and the boundaries of public zones of easements or archaeological heritage sites.
  7. Land plot planning scheme confirming the placement of a linear type object within the red line approved in the territory planning documents in relation to linear type objects.
  8. Image of architectural schematic solutions.
  9. Information related to engineering equipment, as well as a summary plan for engineering and technical supply networks, which is characterized by the presence of points for connecting the construction site itself to these networks.
  10. Design documentation for organizing the construction process in relation to the facility.
  11. Project documentation relating to the organization of the process of demolition or dismantling of a construction project and its constituent parts.
  12. A permitting conclusion recorded in the examination of design documentation issued by a state body, as well as an affirmative conclusion of the state environmental assessment of design documentation (under the sixth part of Article 49 of the Code).
  13. A permitting document concerning deviations from the parameters of permitted construction or reconstruction work.
  14. Written approval for the reconstruction of the object from all its copyright holders.

Documents allowing you to obtain permission to build an individual residential building

So, what papers need to be collected in order for the implementation of an engineering project to earn the approval of the authorities? It is possible to obtain permission to build a private house outside the city only with the assistance of the governing body, which will decide the fate of the project - whether it will accept it or reject it. To do this, you need to go to the authority that deals with the consideration and resolution of such issues and submit an application for permission to build a private house, completed according to a certain sample. Along with this document, a number of other documents should be provided:

  • certificate of ownership of the plot;
  • urban planning plan of the site, prepared and received in hand three years after submitting the application, not earlier;
  • SPOZU, on which you can see the location of the individual housing construction object;
  • a text description and graphical representation of an object with the purpose of individual housing construction (exclusively for construction within the boundaries of the territories of a historical settlement, which includes, for example, the city of Kolomna, located in the Moscow region. The capital itself is not included in this list.
  • architectural passport of the project.

As a result of the inspection, the applicant receives approval or refusal to issue a permit. Each case is considered individually.

List of documents for private developers

Such persons include persons planning to build a house for a family (one), if its height does not exceed three floors. For them, the answer to the question of what documents are needed for a construction permit includes only three points:

  • title documents for a plot of land (a certificate confirming the registration of rights, a document on the allocation of a land plot or another similar one);
  • urban planning plan for the land plot;
  • layout distribution scheme.

There is a difference where to obtain an urban planning plan for a land plot and an organizational chart. The diagram is a handwritten indication of the location of the house on the land plot, and the urban planning plan is an official document that must be taken from the administration of a given locality.

Most often, the administration issues a complete list of documents that need to be collected and submitted to formalize such a plan. The list includes technical conditions (for electricity, water and gas supply, sewerage), an up-to-date topographic survey of the land, background documentation from an organization involved in the protection of cultural heritage sites, and a house design.

At the legislative level, the solution to the question of how to obtain permission to build a country house is simplified. According to legislative norms, the developer only needs to submit an application, and all other documents must be collected by the local administration. This provision is also enshrined in the Decree issued by the Supreme Court of the Russian Federation.

The document permitting construction applies only to the land plot. He is not tied to either the owner-citizen or the owner-organization.

There is one exception to the rule for submitting documents for private developers. If a real estate property is being built to accommodate more than one family (for example, a townhouse or apartment building), the developer will have to submit a full package of documents under the seventh part of Article 51 of the Code.

Obtain a construction permit in Moscow, the Moscow region and New Moscow

The overwhelming majority of investors and developers do not have the ability to daily monitor and manage the progress of construction and reconstruction of their own projects. This applies to the entire range of residential and non-residential buildings. The customer service in construction solves this problem by taking on the functions of a manager. Solid practical experience and an incredible amount of professional knowledge allow us to obtain a construction permit and solve other problems in record time, without any bureaucratic delays.

Why do you need a building permit?

The construction of houses inevitably begins with obtaining a building permit , since we are talking about capital projects. The specified document confirms the legal position of the building on the land plot and indicates the legality of the developer’s work on the construction of the building.

The need to obtain appropriate permission is reflected in Article 51 of the Civil Code of the Russian Federation . The main purpose of this document is to confirm the compliance of the provisions of the project documents with the requirements of the current GPZU . It is the construction permit that gives the investor or developer the authority to carry out the construction and reconstruction of capital facilities .

Availability of the appropriate permit is a mandatory condition for carrying out construction work affecting the load-bearing elements of buildings and other structural parts that affect the safety and reliability of the building.

Existing legislative norms do not allow the construction of houses without obtaining a building permit . The absence of this paper allows the object to be recognized as unauthorized, which threatens the owner of the land plot with serious sanctions. If violations are detected by regulatory authorities, the owner of the land plot will be obliged to return the territory to its original form at his own expense and compensate for the damage caused by his actions to interested parties.

The issuance of a building permit is carried out by representatives of the local administration , based on the provision of a complete set of documentation and a properly completed application. The result of consideration of the issue is the issuance of permission to begin construction work or the provision of a reasoned refusal to produce this form. The applicant has the opportunity to re-apply for permission by eliminating the shortcomings identified by the authorized body.

How to protect yourself?

Independently going through the authorities often results in disastrous results. This is due to the applicant’s lack of necessary knowledge and understanding of legislative intricacies. These problems can be completely avoided by contacting the customer service in construction . A team of highly qualified specialists will take care of solving problems associated with the full cycle of documentation.

We provide a wide range of services, agreeing on the list of works with the customer during a personal meeting. The technical customer will become your “right hand” in construction matters. At all stages of building construction, qualified employees will defend your interests, using the full range of available legal and technical means. We reflect the completeness and scope of the responsibility assumed in the contract concluded with the client.

Rating
( 2 ratings, average 4.5 out of 5 )
Did you like the article? Share with friends: